Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.
Specifications
Details
Industrial Category:
Safety
Industrial Subcategory:
Gloves and Hand Protection
Industrial Subtype:
Synthetic Gloves
Applications:
Automotive, Construction, Equestrian, Gardening & Landscaping, General Purpose
Back Material:
Spandex with TPR
Brand:
Work Armour
Closure Type:
Velcro®
Colour:
Black/Tan
GTIN:
065537865133
Item Height inches:
1
Item Length inches:
9
Item Quantity:
1
Item Weight lbs:
0.45
Item Width inches:
4
Package Height inches:
13.4
Package Length inches:
25.6
Package Quantity:
72
Package Type:
BOX
Package Weight lbs:
32.4
Package Width inches:
13.4
Palm Material:
Goatskin
Product Series:
Work Armour
Short Description:
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity Spandex stretch back is flexible and provides form-fitting memoryLeather hooded fingertips and reinforced thumb.